| Video Outgoing-inspection | Provided |
|---|---|
| Machinery Test Report | Not Available |
| Core Components | Runner, Oil Cyclinder |
| Plastic Processed | PP, HDPE, PC, ABS, PVC, PE, ABS/PP, PE/PP, HDPE/PP |
| Place Of Origin | Jiangsu, China |
| Station Number | Single |
|---|---|
| Suitable Product Volume | 100-120 L |
| Screw Diameter | 100mm |
| Screw Drive Power | 55 Kw |
| Clamping Force | 600 Kn |
| Name | Plastic Dumbbell Making Machine |
|---|---|
| Screw Diameter | 100mm |
| Material | HDPE, LDEP, PP |
| Machine Type | High Speed Plastic Bottle Making Machine |
| Screw Drive Power | 55 Kw |
| Mold Stroke | 550-1350mm |
|---|---|
| Station Number | Single |
| Suitable Product Volume | 100-120 L |
| Trademark | Dawson |
| Screw Drive Power | 75 Kw |
| Material | P20, S136, Aluminium Alloy |
|---|---|
| Cavity | Multiple Cavities Available |
| Mould Test | The Mould Will Be Strictly Tested Before Shipment |
| Auto-deflashing | Auto-deflashing System Provided |
| Other Services | 24 Hour |
| Video Outgoing-inspection | Provided |
|---|---|
| Machinery Test Report | Provided |
| Core Components | PLC, Engine, Bearing, Gearbox, Gear |
| Plastic Processed | PP, HDPE, ABS, PVC, PE, EVA, PE/PP, HDPE/PP |
| Place Of Origin | China |
| Video Outgoing-inspection | Provided |
|---|---|
| Machinery Test Report | Provided |
| Core Components | PLC, Engine, Bearing, Gearbox, Gear |
| Plastic Processed | PP, HDPE , ABS, PVC, PE, EVA, PE/PP, HDPE/PP |
| Place Of Origin | Jiangsu, China |
| Video Outgoing-inspection | Provided |
|---|---|
| Machinery Test Report | Provided |
| Core Components | PLC, Engine, Bearing, Gearbox, Motor, Gear |
| Plastic Processed | PP, HDPE, PVC, PE/PP |
| Place Of Origin | China |
| Output Capacity | 450~480 PCS/H |
|---|---|
| Screw Diameter | 75 Mm |
| Screw Drive Power | 22KW |
| Output Of HDPE | 100kg/H |
| Voltage | Customer Specified |
| Suitable Product Volume | 0-5 L |
|---|---|
| Output Capacity | 200PCS/H |
| Screw Diameter | 75 Mm |
| Company Attribute | Manufacturer |
| Delivery Days | 55 Days |