| Application | Bottles, Jars, Jerry Cans, Gallons, Containers |
|---|---|
| Auto-Deflashing | With Auto-Deflashing |
| Mould | One Cavity Or Two Cavity |
| Sutiable | 0~5L Bottle |
| Made In | China |
| Core Components | PLC, Engine, Bearing, Gearbox, Gear |
|---|---|
| Voltage | 440V/415V/380V/220V |
| Screw Heating Power(kW) | 18KW |
| Mold Platen Size(Width)(mm) | 900 Mm |
| Air Comsumption(m³/min) | 1.2 M³/min |
| Screw | 76 Mm |
|---|---|
| Shot Size | 1766 Cm³ |
| Shot Weight | 1590 G |
| Injection Pressure | 158 Mpa |
| Injection Rate | 398 G/s |
| Plastic Processed | PP, HDPE, ABS, PVC, PE, EVA, PE/PP, HDPE/PP |
|---|---|
| Voltage | 440V/415V/380V/220V |
| Mold Platen Size(Width)(mm) | 1600 Mm |
| Warranty | 1 |
| Mould Lifespan | > 2,000,000 Cycles |
| Machine Appearance Color | Customizable |
|---|---|
| Logo Customized | Yes |
| Samples Provided | Provide Bottle Sample After Mold Test For Confirmation |
| Manpower Required | 1~2 Operator |
| Engineer Service | Engineers Can Go To Customer's Factory For Installation Training |
| Machine Appearance Color | Customizable |
|---|---|
| Logo Customized | Yes |
| Samples Provided | Provide Bottle Sample After Mold Test For Confirmation |
| Manpower Required | 1~2 Operator |
| Engineer Service | Engineers Can Go To Customer's Factory For Installation Training |
| Model NO. | ABLB65I |
|---|---|
| Station | Double Station Double Die Head |
| Max. Product Volume | 2L |
| Clamping System | Toggle Type Clamping System |
| Suitable Material | HDPE,PP,PVC,PS,PETG,LDPE |
| Screw Diameter | 40mm |
|---|---|
| Screw L/D Ratio | 20.5:1 |
| Theoretical Injection Capacity | 238cm³ |
| Injection Pressure | 174Mpa |
| Max. Hydraulic Pressure | 140Kg/cm |
| Screw Diameter | 40mm |
|---|---|
| Screw L/D Ratio | 20.5:1 |
| Theoretical Injection Capacity | 238cm³ |
| Injection Pressure | 174Mpa |
| Max. Hydraulic Pressure | 140Kg/cm |
| Extruder Motor Power(kW) | 55 KW |
|---|---|
| Screw Diameter (mm) | 100 Mm |
| Dimension(L*W*H) | 5.4*2.5*4.5 |
| Mould Lifespan | > 1,000,000 Cycles |
| Labor Demand | 1~2 Operetor |