Contact Us

Contact Person : Kenmartin

Phone Number : 008613913143237 

WhatsApp : +008613913143237

Free call

Operation specification of blow molding machine

April 25, 2022

 

Operation specification of blow molding machine

Necessary knowledge of safe operation specification of automatic blow molding machine

(1) Before starting each shift, lubricating oil must be added to each moving part. (manipulator, manipulator guide rail, mold opening and closing guide rail)

(2) The swing arm can be added once every (3-4) days. The large chain and small chain of the heating machine can be used once a month. Always check whether the main engine reducer and the heating machine reducer are short of oil. The main engine bearing can be added once every 3 months.

(3) Before production, check whether the moving parts are firm, whether the screws are loose or falling off, especially in places with strong impact force, and whether the belt transmission part is abnormal.

(4) Check whether the high-pressure air source, low-pressure air source, power supply and water source are normal.

(5) Check whether each emergency stop switch, safety door switch, and protection device detection switch are normal.

(6) Check whether the heating head enters the embryo and the embryo drop part works normally. If the embryo is not in place, the nut of the pressing device can be adjusted.

(7) Check whether the lamp tube is damaged or broken. To be replaced in time.

(8) Check whether each pneumatic component is leaking and whether the action is sensitive.

(9) Check whether the triplet is abnormally leaking, whether it is blocked, and whether the water storage capacity of the water cup is too full.

(10) When the solenoid valve of the automatic blow molding machine is abnormal, it should be cleaned in time (every 3.5 million blows are cleaned once).

Get in touch with us

Enter Your Message

kenmartin@dawson-plastic.com
+008613913143237
008613913143237 
t542892865
008613913143237